GVK Power (Goindwal Sahib) Limited to set up 2×300 MW Coal based TPP at Goindwal Sahib Village in Tarantaran in Punjab. The total land requirement is 715 acres. Coal requirement is estimated at 7173 TPD at 100% PLF, which will be obtained from captive coa
Leave a Reply